THISTLE HOUSE

This was a unique challenge that required special attention and consideration to detail. The floor plan was designed as a architectural dream around key points of interest to the customer. The structural steel fabrication required to accomplish this dream was by far NOT common to industrial standards. No standard steel fabrication shop wanted to be part of this creation. This required us to take it upon our selves to fabricate each component. Using AutoCAD Advance Steel, numerous phone calls and email, file sharing and links to 3D drawings, we were able to come to an agreement between the Architect and Structural Engineer to how this dream would come to life. All together 52,500 lbs. of steel would be required to create the structure.